Civil Defense Approvals & Fire Licensing
We prepare your facility for civil defense approval: survey, drawings to the Egyptian fire code, the required fire systems, and the application file through to inspection.
12System scope
Civil Defense Approvals
- 01Site survey and review of the building's activity and occupancy
- 02Gap review of existing fire protection against the Egyptian fire code
- 03Fire alarm, fire fighting and emergency lighting drawings for submission
- 04Supply and installation of the systems the approval requires
- 05Testing, commissioning and handover documents
- 06Preparing the application file and following it up to the inspection
Overview
Civil Defense Approvals & Fire Licensing
Most facilities in Egypt need civil defense (civil protection) approval before they open, renew a licence or change their activity. The requirements depend on the building's use, area and occupancy. We start by visiting the site and reviewing what is already installed, then tell you clearly what is missing. Our engineers prepare the drawings to the Egyptian code for fire protection of buildings, install the fire alarm, fire fighting and other systems the approval needs, test them, and prepare the file for submission. We stay with you until the inspection, and offer periodic maintenance afterwards so the systems stay ready for renewal.
Applications
How we engineer it
From concept to commissioning
Ten stages, each with a defined deliverable, so you always know what has been checked and what comes next.
Survey & risk review
Hazards, occupancy, existing services and authority requirements are recorded on site.
Design & calculation
Layouts and calculations are prepared and coordinated with the other trades.
Supply & installation
Approved equipment is installed to shop drawings under supervision.
Test, commission & maintain
Every function is tested and handed over with records and a service plan.
Industries served
Protection shaped by the risk
Have drawings ready?
Send your drawings for an engineering review and quotation.